METHODS FOR CONSTRUCTING QUALITY AND ECONOMICAL TOWNHOUSES

News
Date Submitted: 27/09/2024 10:14 AM

METHODS FOR CONSTRUCTING QUALITY AND ECONOMICAL TOWNHOUSES

Building a house is always a job that makes many people have a headache with dozens of problems to worry about. For example, how to construct to ensure quality, safety and save costs? Understanding that problem, in the article below will share with you the method of constructing townhouses from the rough to the finished part, which is summarized from the experience of leading construction experts. Through this, you can proactively control the quality and progress of building townhouses effectively!

1. How is townhouse construction understood?

Construction method is one of the important steps in building a townhouse. It shows the process as well as the construction steps for the construction project. This is considered an ideal solution for busy homeowners, who can rest assured to hand over the whole package to the construction contractors.

2. Stages to be taken in townhouse construction measures

In the construction of townhouses, there will be 3 stages to be carried out including: site preparation, rough construction and finishing. Below are the specific tasks to be done for each stage:

2.1 Site preparation stage

First, you need an architectural design drawing showing the architectural details, facade and structure. This is considered the basis to help you have a beautiful and sustainable house as desired. In addition, the drawing also helps the construction process to take place more smoothly and quickly, minimizing unnecessary errors. However, to achieve this, you need to find an architect with high expertise and good aesthetics to be responsible for carrying out the design work.

Biện pháp thi công nhà phố chất lượng tiết kiệm

Bản vẽ thiết kế kiến trúc nhà phố

Once you have the drawings, you move on to the site preparation stage. If the land to be built is vacant land, site preparation will be simpler. But if the current status of the land has old houses and buildings, they need to be demolished.

Demolition requires a prior survey and permission from the Ward and District Construction Inspection Department. Once the demolition is complete, you proceed to gather materials to prepare for the initial construction steps.

Note: Depending on the scale of the townhouse, you decide the amount of materials to gather, to ensure enough space to store materials and facilitate the construction process.

2.2 Measures for constructing townhouses in the rough construction phase

Measures for constructing townhouses in the rough construction phase have a direct impact on the quality of the project. This phase is specified directly in the design drawings. Accordingly, engineers are responsible for supervising the construction according to the drawings, including the following specific tasks:

  • Digging the foundation, treating the ground, constructing formwork, steel reinforcement, pouring concrete from the top of the pile or bored pile up. Depending on the soil conditions and structure of the house, use the appropriate type of foundation. Normally, for townhouses, you can choose to use strip foundations and pile foundations.
  • Constructing formwork, steel reinforcement, pouring concrete for stairs, braces, beams, columns, floors, ... all floors, terraces, roofs according to the design.
  • Constructing the roof, based on the design of the roof type, tile or concrete, there will be different processes and times. Usually, tile roofing will take more time and cost than corrugated iron or concrete roofing.
  • Building bricks and plastering the entire surrounding walls, room walls, technical boxes, steps, stairs with bricks.
  • Installing a concealed water supply and drainage system.
  • Construction and installation of conduit systems, electrical junction boxes of all kinds.
  • Waterproofing construction, WC, terrace. For the waterproofing of the wall base, chemicals have been mixed into the masonry.

Biện pháp thi công nhà phố chất lượng tiết kiệm

Thi công nhà phố giai đoạn phần thô

Homeowners want to know the quality of their townhouse; need to carefully examine the rough construction method compared to reality.

2.3 Construction methods for townhouses in the finishing stage

No matter how busy the work is, homeowners should take the time to learn about the construction methods for townhouses in the finishing stage. This will help you easily control the quality, avoiding errors later. Some of the work that needs to be done at this stage includes:

  • Plastering the entire house: Finishing the entire house in layers; after the rough construction is the plastering layer, it is necessary to carefully check the stage; so that the house is fully completed.
  • Flooring: This should be done before tiling; pay attention to the flatness after plastering with cement mortar.
  • Tiling: Pay attention to the alignment of the tiles. If you find any errors, you must immediately notify the construction team. Because even a small error will affect the overall aesthetics of the house.
  • Exterior and interior painting: This stage requires high meticulousness; because it directly affects the aesthetics of the house. Then, proceed to paint the interior and exterior to complete the house.
  • Install electricity, water and technical systems; Sanitary equipment, electrical system terminals; and water conditioning systems are installed in the finishing stage.

Biện pháp thi công nhà phố chất lượng tiết kiệm

Thi công nhà phố giai đoạn hoàn thiện

Note: If there is an interior installation part, you should base on the design to distribute; choose suitable furniture, harmonious colors, and balanced size.

3. Introducing a reputable design & construction consulting service provider

The importance of construction units is undeniable, their reputation will ensure the quality and aesthetics of your project. Currently, there are many units providing design and construction services to meet the increasing construction needs in our country. Therefore, finding a reputable unit is not easy and requires you to spend time researching. In the selection process, you need to research carefully and ensure that the accompanying unit must have high expertise, many years of experience, have a clearly signed contract, transparent costs, ... To help customers save time searching, Hung Nghiep Phu Construction Investment Co., Ltd. is confident that it will be the best choice for you.

Giày Sneaker en

Hung Nghiep Phu Construction Investment Co., Ltd. with the mission of providing the best solutions and services, building a prosperous community with customers, Hung Nghiep Phu is gradually affirming its brand through sincere cooperation, with a leadership team with ethical capacity, creativity, high expertise and strategic vision. Hung Nghiep Phu owns a team of skilled, highly qualified employees who will bring customers the best quality technology.

Hung Nghiep Phu Construction Investment Co., Ltd. - specializes in constructing civil and industrial works. We look forward to accompanying customers in construction projects as well as continuous procedures such as planning diagrams, applying for construction permits, completing procedures, applying for fire prevention and fighting certificates, ... If you have any questions or are in need of design, completing procedures, please contact us immediately for free consultation!

>>> Xem thêm:

_____________________

CONTACT INFO:

???? Facebook: Công ty TNHH Đầu tư Xây dựng Hưng Nghiệp Phú (興業富) 

☎️ Hotline: 1800.3368 (Miễn phí)

???? Website: xaydunghunnghiepphu.com

???? Gmail: kinhdoanh01@xaydunghungnghiepphu.com

???? Address: No. 2034D, Group 22, Phuoc Thai Hamlet, Thai Hoa Ward, Tan Uyen City, Binh Duong Province

------

Source: Compiled from the Internet



Other News articles

Partner

© 2022 HUNG NGHIEP PHU CONSTRUCTION INVESTMENT COMPANY LIMITED, All rights reserved. Web design by HD Agency