WATER SUPPLY AND DRAINAGE CONSTRUCTION METHODS

News
Date Submitted: 24/09/2024 03:30 PM

WATER SUPPLY AND DRAINAGE CONSTRUCTION METHODS

Construction of water supply and drainage in civil construction requires careful calculation. Because even a small mistake can cause trouble for the homeowner as well as affect the surrounding living environment. So what are the measures for construction of water supply and drainage in civil construction? Follow Hung Nghiep Phu to follow the article below!

1. What is a drainage system?

Before learning about water supply and drainage construction methods, you need to understand the concept of water supply and drainage systems.

Biện pháp thi công cấp thoát nước trong xây dựng

Hệ thống cấp thoát nước đóng vai trò cực kỳ quan trọng trong công trình

The water supply and drainage system is a system that provides users with the type, volume and quality of water to meet different needs, and at the same time undertakes the collection, transportation and treatment of users' wastewater to remove pollutants in wastewater for human health and environmental protection.

The water supply and drainage system includes the water supply system, wastewater drainage system, rainwater drainage and then collects all types of domestic water, wastewater from the sub-pipe systems in the project for construction, regulation, distribution and then transports through the drainage network system to the septic tank and discharges outside.

2. Construction measures for water supply and drainage in civil construction

In the project, water supply equipment such as pumps, valves, pipes, etc. used must comply with the design requirements in terms of type, quality and origin. Water pipes and equipment must be installed in the correct position and in accordance with the design regulations. In addition, the joints must be secure and tight, and after installation, measures must be taken to protect the pipes and equipment from being crushed, distorted or damaged.

Biện pháp thi công cấp thoát nước trong xây dựng

Biện pháp thi công cấp thoát nước được thực hiện kỹ lưỡng, đảm bảo chất lượng sau khi đưa vào sử dụng.

During construction, plumbers must coordinate with bricklayers and formwork workers to arrange pipes, water supply and drainage pipes through beams, floors and walls according to the previous design drawings. Construction pipes must be carefully preserved to avoid sand, soil, etc. falling into the pipes during the construction process.

Pipe threads and pipe joints must ensure tightness to avoid leakage. Underground water pipes must be installed before the bricklayer plasters the walls.

After installation is completed, the contractor must conduct a pressure test for each pipeline and according to the specific usage requirements of the pipeline according to the design. Pressure testing equipment includes an electric pressure pump, a pressure gauge with a measurement index of 0 - 20 kg/cm2, and an air release valve.

During the testing process, the pipe must be filled with water slowly; and carefully so that all air escapes; the pipe must be filled with water; within 24 hours before conducting the pressure test; test pressure and test time must comply with design regulations and investor instructions.

3. Some notes when carrying out water supply and drainage construction measures

To ensure the quality and technical construction of water supply and drainage; you need to ensure the wastewater drainage system; should not use complicated connections such as "T" and "X" connections. These connections make wastewater easy to stagnate and become clogged.

Wastewater systems and drainage pipes need to be equipped with inspection doors. This is a way to help clear the entire system. Depending on whether the main drainage pipe is horizontal or vertical; the inspection door is arranged directly at the water trap or at the bottom of the pipe. However, the inspection door must be easily accessible.

In addition, sanitary equipment must be equipped with odor-preventing water traps. Manholes, septic tanks or wastewater tanks; must also be watertight, airtight and ventilated. Horizontal wastewater pipes must have a slope in the direction of flow; a suitable way to push both liquid and solid waste out.

4. Introducing a reputable design & construction consulting service provider

The importance of construction units is undeniable, their reputation will ensure the quality and aesthetics of your project. Currently, there are many units providing design and construction services to meet the increasing construction needs in our country. Therefore, finding a reputable unit is not easy and requires you to spend time researching. In the selection process, you need to research carefully and ensure that the accompanying unit must have high expertise, many years of experience, have a clearly signed contract, transparent costs,... To help customers save time searching, Hung Nghiep Phu Construction Investment Co., Ltd. is confident that it will be the best choice for you.

Giày Sneaker en

Hung Nghiep Phu Construction Investment Co., Ltd. with the mission of providing the best solutions and services, building a prosperous community with customers, Hung Nghiep Phu is gradually affirming its brand through sincere cooperation, with a leadership team with ethical capacity, creativity, high expertise and strategic vision. Hung Nghiep Phu owns a team of skilled, highly qualified employees who will bring customers the best quality technology.

Hung Nghiep Phu Construction Investment Co., Ltd. - specializes in constructing civil and industrial works. We look forward to accompanying customers in construction projects as well as continuous procedures such as planning diagrams, applying for construction permits, completing procedures, applying for fire prevention and fighting certificates, ... If you have any questions or are in need of design, completing procedures, please contact us immediately for free consultation!

>>> See more:

_____________________

CONTACT INFO:

???? Facebook: Công ty TNHH Đầu tư Xây dựng Hưng Nghiệp Phú (興業富) 

☎️ Hotline: 1800.3368 (Miễn phí)

???? Website: xaydunghunnghiepphu.com

???? Gmail: kinhdoanh01@xaydunghungnghiepphu.com

???? Address: No. 2034D, Group 22, Phuoc Thai Hamlet, Thai Hoa Ward, Tan Uyen City, Binh Duong Province

------

Source: Compiled from the Internet



Other News articles

Partner

© 2022 HUNG NGHIEP PHU CONSTRUCTION INVESTMENT COMPANY LIMITED, All rights reserved. Web design by HD Agency